by admin | Oct 3, 2023
Pak n Save Whakatane Carpark upgrade The project required the upgrade of Pak n Save’s carpark.
by admin | Sep 2, 2023
Matahi Storm Damage Repairs This project required the excavation for bank widening of 9500m3 and new road formation as required for dropout repairs. Included was the benching and building up of the dropouts with granular fill to road level. Included in the project was...
by admin | Jul 17, 2023
This project consisted of full demolition of 3 classrooms, including: implement traffic management, site fencing, construct access route and hardstand, removing all fixtures, windows, fences, etc; demo buildings and dispose of all materials, construct floor...
by admin | Jun 12, 2023
Army Hall Demolition This project consisted of full demolition of the hall, including: implement traffic management, site fencing, removing all fixtures, windows, etc, disconnection of services, demo building and dispose of all materials, level off entire area, import...
by admin | May 5, 2023
Water Renewal Project The project required for the supply and install DN63 and DN125 PE pipe including connections. There were also some rural connection back flow prevention devices installed. The pipeline was installed as much as possible by drilling to reduce the...