Whakatāne District Council

Sep 2, 2023

Matahi Storm Damage Repairs

This project required the excavation for bank widening of 9500m3 and new road formation as required for dropout repairs. Included was the benching and building up of the dropouts with granular fill to road level. Included in the project was the installation of culverts and flumes and two large and very complex retaining walls.