The project required for the supply and install DN63 and DN125 PE pipe including connections. There were also some rural connection back flow prevention devices installed. The pipeline was installed as much as possible by drilling to reduce the reinstatement work. Trenchless methods in installing pipe, PE welding and testing, working within road reserve.