by admin | Sep 2, 2023
This project required the excavation for bank widening of 9500m3 and new road formation as required for dropout repairs. Included was the benching and building up of the dropouts with granular fill to road level. Included in the project was the installation of...
by admin | Jul 17, 2023
This project consisted of full demolition of 3 classrooms, including: implement traffic management, site fencing, construct access route and hardstand, removing all fixtures, windows, fences, etc; demo buildings and dispose of all materials, construct floor...
by admin | Jun 12, 2023
This project consisted of full demolition of the hall, including: implement traffic management, site fencing, removing all fixtures, windows, etc, disconnection of services, demo building and dispose of all materials, level off entire area, import metal and...
by admin | May 5, 2023
The project required for the supply and install DN63 and DN125 PE pipe including connections. There were also some rural connection back flow prevention devices installed. The pipeline was installed as much as possible by drilling to reduce the reinstatement work....
by admin | Apr 27, 2023
This project involved the construction of a walk/cycleway along more than 1.5km of the Whakatane River stop bank along with parking areas, vehicle crossings, steps, retaining walls and placing of ducting and lighting poles. The contract required close liaison with...